Pecafil® is a lightweight, versatile formwork material that can be installed quickly without the need for a crane. Prefabricated angles allow for easy formwork setup, saving time and costs.
The decoupling of an existing wall and a new wall can be achieved by creating a cavity using Egcovoid® settlement plates. Watch the installation video to see how easy it is to use.
A new fire station, known as the New Platteville Fire Facility, is currently under construction in the city of Platteville, Wisconsin. Our Pecafi® provides full support in this regard.
MAX FRANK offers a wide portfolio of tested products in the areas of formwork and sealing technology as well as spacers to meet the high requirements of drinking water structures.
Sustainability is becoming increasingly important in the construction industry. Here you will find the DGNB and LEED documents for fibre concrete spacers.
The fixed connection consists of a standard socket and lock nut and is used for connections that cannot rotate freely. A reliable screw connection – especially for large reinforcement diameters.
The DC 2 skyscraper, currently under construction, will be one of the tallest buildings in Austria. MAX FRANK supplied the Egcobox® thermally insulating cantilever connector to the project.