Enviar por correo electrónico el enlace a la lista de precios:
The secondary reinforced construction joint formwork element with its single-sided formwork element serves for the formation of an upstand for the wall/slab.
For watertight joints the formwork element comprises a metal water stop according to your specifications.
The reinforcement overlap between the first and second concreting section is ensured by the installation of the formwork element between the lateral reinforcement layers.
+34 91 826 51 00 - Ext. 212
MAX FRANK España
Calle Agustín de Foxá 40
28036 Madrid
ES Spain