The secondary reinforced construction joint formwork element for wall areas creates a rough surface and ensures a forced-locked connection between the first and the second concreting section.
The formwork element comprises a vertical indentation.
The reinforcement overlap between the first and second concreting section is ensured by the installation of the formwork element between the lateral reinforcement layers.
+33 (0)5 63 03 48 98
Max Frank SAS
25 Impasse de Monaco
82000 Montauban
France