To ensure compliance of the concrete cover in the Exzenterhaus, a range of fibre-reinforced concrete spacers in various designs have been installed.
Completed in September 2012 the Bochum landmark serves as an office and administration building and is one of the most exclusive business addresses in the Ruhr area. Costing around 17 million Euros the office block features an almost circular cross-section and several offset segments. It reaches a total height of approx. 84 m. The foundation is a protected air raid shelter which was built in 1942.
MAX FRANK fibre-reinforced concrete spacers in various designs were used to ensure compliance of the concrete cover. Tubbox® column formers for the formwork of the concrete columns ensure an economical and time-saving design.
Office building
Frings Bautechnik GmbH & Co.KG, Erkrath
www.frings-bautechnik.de
Max Frank Middle East FZE
M3-15, P. O. Box: 123601
Saif Zone, Sharjah
United Arab Emirates