UAE: englishUAE: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italiano
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutschfrançais
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

Co-Living Space

Leipzig, Germany

A living concept for interaction, comfort, flexibility and community in the urban living space.

The co-living and hotel project is located close to the city, 600 m northeast of Leipzig's main train station and adjoins the constantly flowing Parthe River to the south. Along Berliner Straße, an enclosed development with a hotel block has been created. The hotel in the three-star superior segment has approximately 224 guest rooms distributed over seven floors. The inner courtyard situation is to be developed & upgraded, with green areas and a high quality of open space. The Parthe is accompanied by a meandering building complex consisting of three components of five to six stories, which is connected by three-story intermediate buildings and has underground parking spaces.

During planning, the problem of desiccated and overall subsoil quality arose. The load of the hotel complex will be transferred by piled foundations. However, a planned settlement of the piles and the floor slab was proposed by the designer as an economical solution due to the load of the building in its finished state. In order to relieve the floor slab of potential constraints during settlement, a void space was designed in. This is generated by the product Pecavoid®, which serves as a stable formwork during concreting, but collapses and creates a cavity when a predefined breaking load is reached. The product is also reliable for use to the nearby Parthe River. The groundwater level is above the base of the building & during the construction phase, the groundwater level was lowered.

To ensure high-quality construction, the Zemseal® sub-structure waterproofing membrane was included as a waterproofing concept. This was laid directly over the Pecavoid®. The waterproofing concept was completed by Stremaform® working joints with integrated Fradiflex® metal water stop.

Type of building:

Hotel, Residential building

Clients and Developers:

FAY Projects GmbH
https://www.fay.de

Architect:

TCHOBAN VOSS Architekten
www.tchobanvoss.de

Engineers/ Specialist Planners:

KREBS+KIEFER Ingenieure GmbH

Building contractor:

Ed. Züblin AG, Filiale Dresden

Distributor:

Thomas Schlafge Schalungsbedarf
www.schlafge-mgbh.de

Completion:

2024

Project link:


Products used
Contact Contact
+971 6 5578197

Max Frank Middle East FZE
M3-15, P. O. Box: 123601
Saif Zone, Sharjah
United Arab Emirates

blub