UAE: englishUAE: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italianodeutsch
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutschfrançais
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

BMW Welt

München , Germany

BMW Welt is a museum, exhibition and event centre which celebrates the BMW brand and is located close to the Vierzylinder tower in Munich.

BMW Welt was built between August 2003 and autumn 2007 very close to the Vierzylinder tower in Munich. MAX FRANK supplied Stremaform® expanded mesh formwork elements with reinforcement for the reinforced concrete construction working joints.

Stremaform® in the BMW Welt building project:

  • Floor/wall and wall/ceiling transitions: Stremaform® Type 3060 formwork element with rubber water bar guide
  • Underfloor ducts: Stremaform® Type 3000 flat material
  • Floor slab working joints: Stremaform® Type 4040 water stop with double indent joint and rubber water bar guide
  • Controlled crack joint, wall: Stremaform® Type 3530 formwork element for controlled crack joint with rubber water bar guide

Bar spacers and fibre-reinforced concrete single spacers were also used for this project. Fibre-reinforced concrete spacers ensure compliance of the concrete cover before and during concreting.

Type of building:

Museum

Architect:

Architekturbüro COOP HIMMELB(L)AU

Engineers/ Specialist Planners:

Tragwerksplanung: Ingenieurbüro Schmitt, Stumpf, Frühauf und Partner, München

Building contractor:

Wiemer & Trachte, Dortmund

Completion:

2007

Products used
Contact Contact
+971 6 5578197

Max Frank Middle East FZE
M3-15, P. O. Box: 123601
Saif Zone, Sharjah
United Arab Emirates

blub