An office complex with 20,000 sqm of rental space, 47 underground parking spaces and 37 outdoor parking spaces has been built on Nordkanalstraße in Hamburg Hammberbrook.
To avoid complex formwork and reinforcement in the area of the expansion joints in the concrete construction, the client decided on the Egcodorn® WN and WQ (DIBt approval Z-15.7-301) shear force dowels. These shear force dowels are used with very high static loads. The construction of the Egcodorn shear force dowel enables transmission of the highest shear forces, even with minimal component dimensions. The unique corrosion protection system and the use of high quality materials guarantee maximum durability.
Extra fire protection requirements were imposed on this construction project. The Egcodorn® execution with fire protection collar and mineral wool perfectly meets these requirements.
Product information about the shear force dowel connection:
Office building
Objektgesellschaft Sonninstraße II. Gewerbebau GmbH & Co. KG, Oststeinbek
LA`KET Architekten GmbH, Hamburg
www.laket.net
agn Leusmann GmbH, Hamburg
www.agn.de
AUG. PRIEN Bauunternehmung (GmbH & Co. KG), Hamburg
www.augprien.de
Friedrich Niemann GmbH & Co. KG, Kiel/Kronshagen
www.f-niemann.de
Max Frank Middle East FZE
M3-15, P. O. Box: 123601
Saif Zone, Sharjah
United Arab Emirates