In order to protect overbuilt existing structures such as tunnels or channels from the load of a new building situated above, a load-free separation layer can be created between the existing structure and the new building using the Egcovoid® void former.
The use of Stremaform® underwater simplifies and minimises the submerged construction work. This simple installation of the substantial units reduces the overall cost of underwater work to a minimum.
The MAX FRANK Group continues its generational transition in Engineering. The handover from Manfred Hanrath to Moritz Michel combines experience with fresh ideas.
Understand fibre concrete distance tubes correctly and use them purposefully to construct concrete walls safely and efficiently. For watertight results, they should be coordinated with the structural design, temperature, and a suitable sealing solution.
In larger building projects, crane foundations are integrated directly into the floor slab and are the first areas to be concreted. Stremaform® is useful to get connected and sealed this construction situation.