United Kingdom: englishUnited Kingdom: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italiano
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutsch
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english

How to: Precast balconies with shortened tensile bars for a more compact transport volume

Thermal break Egcobox® with Coupler system threaded bar connection
Thermal break Egcobox® with Coupler system threaded bar connection
© www.maxfrank.com

The sizes of balcony slabs can be substantially reduced for transport from the precast plant to the building site. For improved delivery and installation conditions, the tensile bars of the Egcobox® cantilever connectors are manufactured shorter, using Coupler screwed connections. The threaded reinforcement extensions are attached on site.

How to:

  • Our Technical Department designs the Egcobox® elements in accordance with the required design loadings and balcony geometry.
  • The Egcobox® balcony connectors are delivered to the precast plant, where they are placed and cast into the concrete.
  • Delivery to the building site with shortened tensile bars – that reduces the transport volume.
  • The balcony slab is positioned and the tensile bar extensions are screwed on.
  • The floor slab is poured.
We recommend
Contact Contact
Contact us

+44 1782 598 041

Place

Max Frank Ltd.
Clough Street, Hanley
Stoke-on-Trent, ST1 4AF
Staffordshire
United Kingdom

Use of cookies

In order to be able to optimally design the website and continue to improve it, we use cookies.
You can find more information about this and about your rights as a user in our privacy policy
Imprint