Stremaform® Forskaling for arbeidsfuger deler opp store konstruksjonskomponenter i betongseksjoner. Ingen avbrudd i forsterkning.
ProduktStremaform® forskaling for arbeidsfuger som holdes på plass
In larger building projects, crane foundations are integrated directly into the floor slab and are the first areas to be concreted. Stremaform® is useful to get connected and sealed this construction situation.
NyheterHow to: Crane foundation in concrete floor slab
The Schwabenlandtower, previously known as Gewa-Tower, is the highest residential building with 107 metres height in Baden-Württemberg.
ProsjektSchwabenlandtower Fellbach
Joint Designer
CityLife in Milan is to be a new business and residential district. Its landmarks include the three towers Torre Isozaki, Torre Hadid and Torre Libeskind.
ProsjektCityLife Milan Mailand
The new August-Kühne-Haus is currently under construction at the historic headquarters of the logistics company Kühne + Nagel in Bremen. MAX FRANK supplied thermally insulating Egcobox® cantilever connectors for the precast sections of the load-bearing exposed concrete façade.