Poland: polskiPoland: polski
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italianodeutsch
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutschfrançais
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

Port Torgau

Torgau, Germany

Wzniesiono w porcie nową suwnicę portalową. Połączenie dynamicznie obciążanych szczelin wykonano z trzpieniami poprzecznymi Egcodorn® DND 300.

Torgau Port is a universal harbour in the Leipzig / Halle business area. Since 2007 it has been connected directly to the North German seaports by the Binnenschiffslinie ETS Elbe (Ecological Transport Service).

As part of the restructuring of the interior development as well as the redesign and extension of the quay wall, a new gantry crane was to be built. The two pileiform crane runway girders with a total length of almost 200 m are subdivided into 15 m sections. The coupling of the dynamically stressed joints is created with Egcodorn® DND 300 shear force dowels. The detailed design of the shear force connection was provided as a service by MAX FRANK.

The Egcodorn® DND is currently the only approved shear force dowel connection for dynamically stressed expansion joints (DIBt approval: Z-15.7-266) and is primarily used for navigated joints.

Typ budynku:

Port

Inwestor budowlany:

Sächsische Binnenhäfen Oberelbe GmbH
www.binnenhafen-sachsen.de

Przedsiębiorstwo budowlane:

Streicher Tief- und Ingenierbau Jena GmbH & Co. KG
www.streicher.de

Ukończenie:

2016

Stosowane produkty
Kontakt Kontakt

+48 22 11 00 133

Max Frank Sp. z o.o.
ul. Łopuszańska 36
02-220 Warszawa
Poland

blub