International: englishInternational: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Sweden: svenska
Sweden: svenskaSweden: svenska
Romania: românesc
Romania: românescRomania: românesc
Poland: polski
Poland: polskiPoland: polski
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Italy: italiano
Italy: italianoItaly: italianodeutsch
France: français
France: françaisFrance: français
Spain: español
Spain: españolSpain: español
International: english
International: englishInternational: english
Denmark: dansk
Denmark: danskDenmark: dansk
Germany: deutsch
Germany: deutschGermany: deutsch
Czechia: český
Czechia: českýCzechia: český
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutsch
Canada: english
Canada: englishCanada: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
UAE: english
UAE: englishUAE: english

Queensferry Crossing

South-Queensferry/North-Queensferry , United Kingdom

The Queensferry Crossing is the world's longest cable-stayed bridge and Scotland's largest infrastructure project.

At 210 meters, it has the highest bridge pylon in the United Kingdom. It was built alongside the existing Forth Road Bridge and carries the M90 motorway across the Firth of Forthbetween Edinburgh, at South Queensferry, and Fife, at North Queensferry.

MAX FRANK supplied the CPF formwork liners Zemdrain® MD as well as single and bar spacers made of fibre concrete for the project.

Concrete formed with Zemdrain® has the following benefits:

  • Increased surface hardness and density
  • Improved abrasion resistance
  • Improved freeze/thaw resistance
  • Virtually blowhole and blemish free surfaces
  • Increased chloride and carbonation resistance

Type of building:

Bridge

Clients and Developers:

Transport Scotland 

Architect:

Forth Crossing Design JV (Ramboll, Grontmij and Leonhardt, Ändra & Partner) 

Building contractor:

FCBC (Hochtief, Dragados, American Bridge Morrison Construction) 

Completion:

2017

Project link:


Products used
Contact Contact

+49(0) 9427 189-0

Max Frank GmbH & Co. KG
Mitterweg 1
94339 Leiblfing
Germany

Use of cookies

In order to be able to optimally design the website and continue to improve it, we use cookies.
You can find more information about this and about your rights as a user in our privacy policy
Imprint