In order to protect overbuilt existing structures such as tunnels or channels from the load of a new building situated above, a load-free separation layer can be created between the existing structure and the new building using the Egcovoid® void former.
The MAX FRANK permanent formwork Pecafil® can be used for foundation formwork, where it also proves advantageous in combination with prefabricated reinforcement cages.
In urban areas, the supply & positioning of media ducts in road construction is becoming increasingly important. The universal formwork material Pecafil® in U-shape is particularly suitable as formwork for concreting due to its quick and easy installation.
To insulate external columns, the insulation is often applied after concreting. This is difficult due to the geometrical form of the columns. With a special Tubbox® column formers, the insulation is already integrated during manufacture.
In addition to improvements to the design, modifications considerably facilitate the ordering process and on-site handling. The standardized product now consists of 2 standard length units and 5 standardized components.
When sealing the surface of bored concrete piles, a flat surface is required, which can be achieved with the installation of the Pecafil® permanent formwork.
In larger building projects, crane foundations are integrated directly into the floor slab and are the first areas to be concreted. Stremaform® is useful to get connected and sealed this construction situation.