International: englishInternational: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italiano
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutsch
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

Expansion joints with transverse force transmission and integrated waterstop

Dehnfuge mit Abdichtung und Querkraftübertragung

Efficient Expansion Joint Solutions – Well-designed, Pre-assembled and Time-saving

The planning and execution of expansion joints in concrete structures are often complex and labour-intensive – particularly when additional components such as water stops or shear dowels need to be installed.

Our prefabricated expansion joint systems provide a practical and efficient solution. Shear dowels and the pre-installed holder for the joint tape are already integrated at the factory. This significantly reduces the potential for on-site errors and speeds up the construction process.

The result: greater planning reliability and improved efficiency on site.

Die Dehnfuge mit Fugenband und Schubdornen

How to:

  • The engineered Stremaform® formwork elements are customized to precisely match the foundation design. All standardized and bespoke elements – such as floor/slab to-rising wall transitions – are designed and produced in a factory setting and delivered installation ready to the building site. The installer is provided with shop drawings, indicating the exact location of each element, making sure that the engineered solution does not collide with execution on site.
  • Assembly times are considerably shortened by the integration of Egcodorn® transverse force dowels. Egcodorn® dowels allow for maximum transverse force transmission, while requiring minimal component thicknesses.
  • The only component to be added to the assembly on site is the expansion joint rubber waterbar, which is simply inserted into the provided cage. Thus, the number of splices is reduced and secure placement of the rubber waterbar during concreting operations is ensured.

You can find more insights in the video:

Please accept external cookies to watch this video.
We recommend
Contact Contact

+49(0) 9427 189-0

Max Frank GmbH & Co. KG
Mitterweg 1
94339 Leiblfing
Germany

blub