International: englishInternational: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italiano
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutsch
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english

How to: Subsequently produced load-free zone under a roadway

How to: Subsequently produced load-free zone under a roadway

With the Egcovoid® former, you can reach a planned load-handling after the concreting.

To protect subterranean concrete structures against unintended loads, a flatly load-free layer must be created. This prevents unintended load, by deflections due to dynamic traffic loads (heavy vehicles, trucks, etc.). With the Egcovoid® former, you can reach a planned load-handling after the concreting.

How to:

  • The Egcovoid® panels are laid over a sandbed or similar underground. The choice of the plate thickness (35 mm or 50 mm) depends on the calculated deflection of the decoupled roadway plate.
  • The individual plates are connected securely to each other with a hose system (MAX FRANK accessories) at the prefabricated valve points. The sufficiently long tube end is guided upwards over the bottom plate.
  • A PE film is laid over the Egcovoid® panels as additional moisture protection, a clean concrete layer is applied as mechanical protection to the PE film.
  • After the base plate hardens, the Egcovoid® former are watered via the mounted hose system. Due to the water applied, the Egcovoid® panels create a load-free layer and an independent bearing bottom plate.

September 2017

SERVICE Box
produCT SAMPLE
We recommend
Contact Contact

+49(0) 9427 189-0

Max Frank GmbH & Co. KG
Mitterweg 1
94339 Leiblfing
Germany

Use of cookies

In order to be able to optimally design the website and continue to improve it, we use cookies.
You can find more information about this and about your rights as a user in our privacy policy
Imprint