International: englishInternational: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italiano
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutsch
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

Removal of joint between neighbouring walls

Egcovoid® Setzungsplatte Wandlösung

Extension to Existing Neighbouring Wall – Planned with Precision and Reliability
Extending a structure onto an existing neighbouring wall presents specific challenges in terms of structural stability, settlement behaviour and sound insulation. To prevent future damage or unwanted sound transmission, a professionally executed separation between the existing and new walls is essential.
We ensure a continuous, correctly formed joint, guaranteeing that the existing structure and the extension are technically and structurally decoupled with precision.

Montage Setzungsplatten für Entkopplungsfugen

How to:

  • Select Egcovoid® void formers according to the required joint width: 35 mm or 50 mm wide
  • Cover the void formers on both sides with a PE film (as shown on the above photo).
  • Concrete the facing layer as the load-bearing wall for the new construction.
  • Following the curing of the concrete wall, the void formers are watered. As a result, they lose their stable form and can be completely removed.

You can find more insights in the video:

Please accept external cookies to watch this video.
We recommend
Contact Contact

+49(0) 9427 189-0

Max Frank GmbH & Co. KG
Mitterweg 1
94339 Leiblfing
Germany

blub