International: englishInternational: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italiano
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutsch
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

Foundations for tramway tracks on sandy ground

Strip Foundations for Tram Tracks – Economical and Sufficiently Load-Bearing

Compared to railway tracks, tram tracks are subject to lower loads. Therefore, strip foundations are generally sufficient as a foundation – even in sandy soil conditions.

If the fixing dowels are cast into the foundation during concreting, a rough levelling of the rail height is already possible before the concrete sets. This saves time and ensures an efficient construction process.

How to:

Foundations for tramway tracks on sandy ground
Foundations for tramway tracks on sandy ground
  • Place Pecafil® permanent formwork units for strip foundations on level and compacted ground.
  • Install spacers and reinforcement.
  • Place rails on the reinforcement, paying attention to the exact same height and distances. 
  • Backfill Pecafil® foundation formwork to stabilise the formwork. 
  • Cast the foundations and complete the final covering.

Application of Pecafil® as foundation formwork:

Please accept external cookies to watch this video.
We recommend
Contact Contact

+49(0) 9427 189-0

Max Frank GmbH & Co. KG
Mitterweg 1
94339 Leiblfing
Germany

blub